What a minimum order quantity is
A minimum order quantity (MOQ) is the smallest order a supplier will accept. It can be set in units, as a total order value, or per color or size. Suppliers set MOQs to cover the fixed cost of a production run, such as setting up machines, and to fill whole cartons or pallets.
An MOQ is the supplier's number, not yours. The question for you is whether you can afford it, store it and sell it before the cash it ties up hurts the rest of the business. This calculator answers those three questions for one product at a time.
How the calculator works
- Supplier MOQ and cost per unit give the order cost. Use your landed cost per unit if you know it: the supplier price plus shipping, duty and fees, spread over the units.
- Units you sell a month turn the MOQ into months of stock.
- Cash for this order checks whether you can pay for it and how much you have left.
- Room to store checks whether it fits in your space alongside your other stock.
- Most months of stock to hold is your own limit on how long stock may sit. Any units beyond it are cash tied up for longer than you planned.
Each limit is optional. Leave one blank to skip that check. The largest order that fits is the smallest of the three limits you entered, rounded down to whole units.
The formulas
| Figure | Formula |
|---|---|
| Order cost | MOQ × cost per unit |
| Months to sell | MOQ ÷ units sold a month |
| Cash left | Cash for the order − order cost |
| Spare storage | Room to store − MOQ |
| Units within your months limit | Units sold a month × months limit |
| Stock beyond your limit | MOQ − units within your months limit |
| Largest order that fits | The lowest of cash ÷ cost per unit, room to store and units within your months limit |
Worked example
A tea brand wants a new tin. The supplier's MOQ is 500 tins at a landed cost of $6.00 each. The brand sells about 100 tins a month, has $4,000 set aside, has shelf space for 600 tins and doesn't want to hold more than 4 months of stock.
- Order cost: 500 × $6.00 = $3,000, which leaves $1,000 of the cash
- Storage: 600 − 500 = 100 tins spare
- Months to sell: 500 ÷ 100 = 5 months, one month over the limit
- Units within 4 months: 100 × 4 = 400, so 100 tins are beyond the limit, with $600 of cash tied up in them
- Largest order that fits: the lowest of 666, 600 and 400 = 400 tins
The MOQ fits the cash and the shelf, but it is more stock than the brand wanted to hold. So it asks the supplier for 400 tins and offers to pay $6.50 each. That order costs 400 × $6.50 = $2,600, sells in 4 months and passes all three checks.
Tips for working with MOQs
- Ask before you assume. Many suppliers will take a smaller first order, often at a higher price per unit, to win a new customer.
- Offer something back. A higher unit price, a longer commitment or splitting the order into scheduled deliveries can all make a lower MOQ work for the supplier.
- Check if the MOQ is per order or per variant. A minimum of 500 per color across four colors is 2,000 units, not 500.
- Count the full cost. Freight and duty can make a small order cost far more per unit. Work out the real figure with the landed cost calculator and compare quantities with the price per unit calculator.
- Test sales first. If a new product has no sales history yet, a small first run you can sell through is often worth more than a lower unit price on stock that sits.
MOQ, reorder point and stock levels
The MOQ sets the smallest batch you can buy. Your reorder point says when to place the next order, and the inventory turnover calculator shows how long stock sits overall. To see how fast a product moves at your stockists before you commit, use the sell-through rate calculator. Once the stock lands, put it in front of buyers on a price list.