What a reorder point is
Your reorder point is the stock level at which you place a new order. If you reorder when stock falls to that number, the new delivery should arrive just before you run out, with your safety stock still on the shelf.
Reorder too late and a bestseller goes out of stock, which costs you sales and can let down wholesale accounts. Reorder too early and cash sits in boxes. A reorder point for each product turns "I think we're getting low" into a number you can check each week. It is sometimes called a reorder level.
How the calculator works
- Units sold and days give your average daily sales. Use a recent period that looks like the weeks ahead, such as the last 30 or 90 days.
- Lead time is the number of days from placing an order to having stock ready to sell. Include production, shipping, customs and the time it takes you to check stock in, not just transit.
- Safety stock is a buffer for a slow delivery or a busy week. Enter 0 if you don't keep one.
- Add your current stock to see how many units you have above the reorder point and roughly how many days until you should order.
Part units are rounded up, because you can't keep half a candle on the shelf.
The reorder point formula
| Figure | Formula |
|---|---|
| Average daily sales | Units sold ÷ days in the period |
| Sales during lead time | Average daily sales × lead time in days |
| Reorder point | Sales during lead time + safety stock |
| Days until you reorder | (Current stock − reorder point) ÷ daily sales |
| Days of stock left | Current stock ÷ daily sales |
Worked example
A candle brand sold 180 of its bestselling scent in the last 30 days. Its supplier takes 21 days from order to delivery, and the owner keeps 30 candles as safety stock.
- Average daily sales: 180 ÷ 30 = 6 a day
- Sales during lead time: 6 × 21 = 126 units
- Reorder point: 126 + 30 = 156 units
The brand has 300 candles in stock today. That is 144 units above the reorder point, so at 6 a day it should place the next order in about 144 ÷ 6 = 24 days. The stock on hand would last about 50 days in total.
If the supplier's lead time grew to 45 days, the reorder point would be 6 × 45 + 30 = 300 units, and the brand would need to order today.
Tips for setting reorder points
- Use the right sales period. If a product sells more in the holiday season, base the daily rate on last year's busy months, not a quiet summer.
- Count all channels. Add wholesale orders, marketplace sales and your own site together. A stockist's order can take a month of stock in one go.
- Measure lead time from your records. Use how long recent orders actually took, not the supplier's quote.
- Review often. Recalculate when sales change or a supplier changes its lead time. A reorder point set once and forgotten drifts out of date.
- Keep safety stock sensible. A big buffer on every product ties up cash. Keep more for bestsellers with long or unreliable lead times and less for slow lines.
Reorder point and order quantity
The reorder point tells you when to order, not how much. The quantity depends on your supplier's minimum order, your cash and how fast the product sells. To see how quickly a product moves at your stockists, use the sell-through rate calculator. To check how long stock sits overall, try the inventory turnover calculator. If you want stockists to reorder from you on a regular rhythm too, send them an order form they can fill in.